Event 20 / Event 32 / Event 40 what is this?
Hi everybody
![]() A lot of people here in Europe - specially in Germany - are waiting for their Opel GT / Redline - like me ![]() In January, my dealer told me, that I will get my GT End of April... Now in May -> Mayby September... Here in Germany the Opel-Dealer are having "problems" to get detailed information about the ordering / production / delivery status. My dealer told my today, the the status of my GT is "Event 33". But he could not give me more information Could anyone give my more information about the different EVENT-xx - Status?!?! Thans a lot Best regards Wolf
__________________
Greetings from Germany http://www.opel-speedster-forum.de http://www.opel-gt-forum.de Ordering GT: September 2006 Date of delivery: 2. quarter 2007 |
|
|
|
| Sponsored Links | |
Advertisement |
|
|
|
#2 (permalink) |
|
Member
|
ahhhhhhhhhhhhh
Could nobody say something about this ?!?!? What is the GM - event ?!?!??!
__________________
Greetings from Germany http://www.opel-speedster-forum.de http://www.opel-gt-forum.de Ordering GT: September 2006 Date of delivery: 2. quarter 2007 |
|
|
|
|
|
#3 (permalink) |
|
First 2000 Sr. Member
|
Sky Event Codes..........
Dealers are not necessarially the best sources of information. These Sky event codes may or may not give some understanding into the Opel ordering system. Here are the Sky codes from another recent discussion thread. Good luck.
************************************************ These are the Vehicle Order Event History (VOEH) codes: 1100 Preliminary Order Accepted 1101 Preliminary Order Added Code 1102 - Preliminary Order Added thru Web (thanks Fred356) 2030 Order Re-edited 2050 Order Changed 2000 Accepted by GM 2500 Preferenced 2550 Order Changed (thanks GO DRVN) 3000 Accepted by Production Control 3100 Available to Sequence 3300 Schedule for Production 3400 Broadcast 3800 Produced 4000 Available to Ship 4104 Bailment Invoice 4b00 Bayed (actually a capital B but it can be mistaken for an eight) 4106 Release Bailment 4150 Original Invoice 4200 Shipped 4800 Rail Ramp Unload 4300 Intermediate Delivery 4V03 EDD (Estimated Delivery Date) Updated (thanks GO DRVN) 5000 Delivered to Dealer 6000 Delivered to Customer Please note that some codes may occur numerous times and out of order, such as 2030, 2050, 2550, 3000, 3100, and especially 4b00. Every time your Solstice or Sky is parked someplace to wait to go someplace else, it is Bayed (4b00). **************************************************
__________________
SKY Driver, R-L SKY Redline, 5 Speed Manual Silver Graphite and Chrome Wheels Black & Red Leather Interior CD/MP3 Monsoon & XM Deposit 7/31/2006 Delivered 5/23/2007 (297 days) |
|
|
|
|
|
#4 (permalink) |
|
Member
|
THANKS
And what is EVENT 33 ?!?!? Event 22 - they told my - is production in a few weeks............ Now 33
__________________
Greetings from Germany http://www.opel-speedster-forum.de http://www.opel-gt-forum.de Ordering GT: September 2006 Date of delivery: 2. quarter 2007 |
|
|
|
|
|
#5 (permalink) | |
|
Senior Member
|
Quote:
Ask Deluke in this thread. She maybe able to help you!? Event Codes ........ 5/17/07....... |
|
|
|
|
|
|
#6 (permalink) |
|
Member
|
Danke
![]()
__________________
Greetings from Germany http://www.opel-speedster-forum.de http://www.opel-gt-forum.de Ordering GT: September 2006 Date of delivery: 2. quarter 2007 |
|
|
|
|
|
#7 (permalink) |
|
Super Moderator
|
I don't know what codes the Opel network is using, but the old Saturn VOM codes looked similar, so perhaps that's what they're using here. Doesn't look like they quite square up exactly though, although we ran into a few codes not on this list when we were back on VOMS.
020 - Order Accepted 025 - Selected for Approval 026 - Sent to POMS (Product Order Management System) 030 - Received at POMS (Accepted by the Assembly Plant) This is when you will receive the TPW (Tentative Production Week) 033 - Sequenced & VIN Assigned 038 - Produced (Vehicle Built) 040 - Released to Carrier (Ready for Pick-Up by Transportation) 041 - Invoiced (Dealer receives the actual invoice for the vehicle) 042 - Shipped (On the truck on the way to the intended store) 050 - Received by Deale |
|
|
|
|
|
#8 (permalink) |
|
First 2000 Sr. Member
|
Saturn codes posted by Cerberus:
020 - Order Accepted 025 - Selected for Approval 026 - Sent to POMS (Product Order Management System) 030 - Received at POMS (Accepted by the Assembly Plant) This is when you will receive the TPW (Tentative Production Week) 033 - Sequenced & VIN Assigned 038 - Produced (Vehicle Built) 040 - Released to Carrier (Ready for Pick-Up by Transportation) 041 - Invoiced (Dealer receives the actual invoice for the vehicle) 042 - Shipped (On the truck on the way to the intended store) 050 - Received by Deale These codes are too similar to current codes not to be taken at face value 020 - 2000 - Order Accepted 025 - 2500 - Selected for Approval (Preferenced) 026 - ? - Sent to POMS (Product Order Management System) 030 - 3000 - Received at POMS (Accepted by the Assembly Plant) This is when you will receive the TPW (Accepted by production control) 033 - 3300 - Sequenced & VIN Assigned, (Scheduled for production) 038 - 3800 - Produced (Vehicle Built) 040 - 4000 - Released to Carrier (Ready for Pick-Up by Transportation) (Available to ship) 041 - 4150 - Invoiced (Dealer receives the actual invoice for the vehicle) 042 - 4200 - Shipped (On the truck on the way to the intended store) 050 - 5000 - Received by Dealer I think your Sky has been built ny now and probably shipped. Have no idea how long it takes to get to Europe. Good luck |
|
|
|